Deliverables
What to deliver, when and under which name
Type your team name and we generate the exact file names. Tick each checklist item as you finish it: progress is saved in this browser.
Replaces <nom>. The date uses YYYYMMDD (the delivery day); if your teacher asks for another format, use theirs.
The team's Google Drive folder
📁 (team folder) ├── Plantilla PRT ← project record track ├── <nom>_memoria ← living project report ├── info_equip ← members, GitHub, Taiga (fill it in now!) ├── 📁 incepcio ├── 📁 sprints │ ├── 📁 1 │ ├── 📁 2 │ └── 📁 3 └── 📁 entrega_final
Inception 1: the product vision
Elevator pitch Wed 16/09 · Due Fri 18/09
Files (incepcio folder)
Template: incepcio/nom_incepcio_1.docx. Recommended reading: The Agile Inception Deck.
Presentation
A 2-minute elevator pitch (between 1:55 and 2:05) by one person. Clear and realistic goals, why they matter to an investor today, and concrete facts about the product, business model, market and competitors. Timer and tips →
How it is graded
- Elevator pitch: message (does it convey the vision?) and appeal.
- Product box: clear vision, the 3 or 4 most representative features and an attractive design.
- NOT list: cohesion and coherence between its three parts.
- Market analysis: systematic, thorough scope and a useful analysis that makes your contribution clear.
Contents of incepcio_1
Inception 2: planning
Customer presentation Wed 30/09 · Due Fri 02/10
Files (incepcio folder)
presentation slidescopy of the reportcopy of the record track
Template: incepcio/nom_incepcio_2.docx. In the report (root document) fill in section 2 (Methodology) and 3.4 (Instrumentation).
Presentation
A 10-15 minute customer presentation by two people (not the pitcher), designed to sell the product: include key market insights and high-quality mock-ups.
How it is graded
- Presentation: clear message, shows business value, engaging and consistent with the documents.
- Product backlog: sensible stories ordered by priority, well described, with points and the key acceptance criteria, consistent with the NOT list.
- Other: main stakeholders, a complete list of epics, a clear physical architecture and the most critical mock-ups.
Contents of incepcio_2
Sprint 1
Planning Mon 05/10 · Retrospective and delivery Wed 28/10
At the start (sprints/1 folder)
same day as the planning
At the end
Report template: sprints/1/nom_report_1.docx. Services between teams this sprint: define and negotiate the service you will build and the one you will consume.
Sprint 1 checklist
Sprint 2
Review + planning Mon 09/11 · Demo Mon 23/11 · Due Fri 27/11
At the start (sprints/2 folder)
same day as the planning
At the end
On Monday 23 there is the demo of methodological and cross-cutting aspects: treat it like a mini delivery. Services between teams: each team finishes and offers its own (code, tests, endpoint and documentation).
This is the course's second assessment point (mid-course development).
Sprint 2 checklist
Sprint 3 and closing
Review + planning Mon 30/11 · Final presentation Wed 16/12 · Due Fri 18/12
Sprint 3 (sprints/3 folder)
Closing (entrega_final folder)
- Managerial report: executive summary, most significant deviations, self-assessment (challenges, barriers, opportunities, what you learned, what you would do differently, concepts from other courses) and a final statement on each member's involvement.
- Final release information: step-by-step instructions to run the app and any useful material (videos, docs). It is graded too.
- Final presentation slides.
Services between teams: each team integrates the service offered by its partner team.
Final checklist
Always
What is assessed in every document
- Text: writing, spelling, figures and tables.
- Images: quality and readability (no blurry diagram screenshots).
- Structure: cover page, page and section numbering.
- Layout: page breaks, margins.
Taiga, frozen at every Fag
At each delivery, export the Taiga project, import it as a new project and share that copy with the teachers. Do not touch it again: it must stay unchanged. Step by step →
The project record track (Plantilla PRT)
It is assessed on completeness, on following the guidelines (date, duration, member, activity, story number and comments, one person per row) and on readability (uniform descriptions, useful comments). Activities and an example →